Rizhao Zhongsheng Machinery Co., Ltd.
How to use the new water well drilling rig?
Jun 29,2025
The newly purchased water well driling rig generally needs to go through a running-in period of 60 hours.
A water well drilling rig in the break-in period has the following characteristics:1. Fast wear and tear
2.Poor lubrication
3. Easy to loose
4. A leak occurs
Therefore, it is not recommended to overload the rig during the break-in period
NEXT:
Address: Zuanji Intelligent Equipment Industrial Park, Fulai Community, Juxian County, Rizhao City, Shandong Province
REQUEST QUOTE